Mumbai: The Maharashtra government has reviewed a proposed 31-km underground road tunnel network, dubbed ‘Patal Lok’, aimed at easing traffic congestion in Mumbai, India’s financial capital. The Mumbai Metropolitan Region Development Authority (MMRDA), the state agency that plans and builds major infrastructure in the Mumbai region, presented the plan to Chief Minister Devendra Fadnavis on Thursday.
According to PTI, the meeting was held at the Chief Minister’s official residence, ‘Varsha’. The proposal is at the planning and review stage.
What the tunnel would connect
As per the presentation, the integrated road tunnel system would run for about 31 km in one direction. Through entry and exit points, it would link the Bandra-Worli Sea Link, the proposed bullet train station at Bandra-Kurla Complex (BKC), Dharavi, BKC, Terminal 2 of Chhatrapati Shivaji Maharaj International Airport, the Western Express Highway and the Eastern Express Highway.
Also read: Supreme Court Rebukes States Over School Menstrual Hygiene Reports
The project is expected to give direct connectivity between the eastern and western parts of the city and improve access to BKC and the airport.
IANS reported that the Chief Minister had earlier popularised the term ‘Patal Lok’ while describing his infrastructure vision for Mumbai. His goal is to build parallel underground corridors where vehicles can travel at up to 80 km/h.
Revised Uttan-Virar sea link alignment
A revised alignment for the proposed Bhayandar/Uttan-Virar sea link was also presented. It will form part of the Mumbai-Vadhavan expressway connectivity and had been approved earlier, according to Free Press Journal reports. Marathi media reports said two alignment options were discussed.
Senior officials present included Urban Development Additional Chief Secretary Asim Kumar Gupta, MMRDA Metropolitan Commissioner Dr Sanjay Mukherjee, Additional Commissioner P Velarasu, BMC Commissioner Ashwini Bhide, Thane Municipal Commissioner Saurabh Rao and Mumbai Police Commissioner Deven Bharti.
According to IANS, the wider underground vision also includes twin-tunnel projects such as Thane-Borivali and Mulund-Goregaon, and an underground link from the Eastern Freeway/Atal Setu to Girgaon Chowpatty. The reports do not mention the project’s cost, start date or completion timeline.
Key points
- MMRDA presented the ‘Patal Lok’ integrated tunnel plan to the Chief Minister on Thursday.
- The tunnel would be about 31 km long in one direction.
- It would link BKC, Airport Terminal 2, Bandra-Worli Sea Link, Dharavi and both express highways.
- A revised Uttan-Virar sea link alignment was also presented.
- Cost and timeline have not been reported yet.
Frequently Asked Questions
What is ‘Patal Lok’ in Mumbai?
It is the name given to a proposed integrated underground road tunnel system, about 31 km in one direction, to connect key parts of Mumbai.
Has construction been approved?
Reports say the state government reviewed the plan after MMRDA’s presentation. No start date, cost or timeline has been reported.
Read this story in Hindi: मुंबई में 31 किमी का ‘पाताल लोक’ सुरंग नेटवर्क, MMRDA ने मुख्यमंत्री को दिखाया प्लान
सीधे अपनी Facebook फ़ीड में पाएँ — News Nation Online पेज को Follow करें।
Discover more from NewsNation Online
Subscribe to get the latest posts sent to your email.

















Leave a Reply